Location: Paris, France
The lighting master plan designed by Atelier dada, structuring the surface-level connection between the northern rail hub — Gare du Nord, Gare de Magenta and Gare de l'Est — has now entered the execution phase.
The project aims to support pedestrian flows and enhance nocturnal legibility within this strategic area of the capital, while delivering a coherent and fluid lighting experience. The lighting strategy addresses user comfort, safety, and integration within the existing urban environment.
Project Owner (MOA): City of Paris
Delegated Project Owner (MOD): Department of Roads and Mobility (DVD)
Technical Design Team (MOE): EVESA
Installer: Citeos — VINCI
Lighting Design (MOE): Atelier dada
